Industrial and flex parks

Tenant electric billing for industrial and flex parks

Industrial tenants run compressors, welders, ovens and cold storage. Their power bills look nothing alike. MeterSight bills each unit for exactly what it used, and shows you who sets the peak.

What MeterSight does for industrial and flex parks

Uneven loads, fair bills

A machine shop and a storage tenant shouldn't split the bill by square footage. Metered billing charges each for its own kWh.

See who sets your demand

Silver shows 15-minute demand by meter, so you know which tenant drives the demand charge before you renew a lease.

Protect shared equipment

Gold catches sags, swells and harmonics from heavy equipment before they become a dispute between tenants.

From meter reading to invoice

Start with Bronze for invoices. Most industrial parks add Silver for demand, and Gold where power quality affects tenants' equipment.

  1. 22,384.6kWh

    Read the tenant's meter

    Bronze reads cumulative kWh from your Modbus meters and closes each billing period on the day you choose.

  2. $0.08per kWh

    Apply your blended rate

    Divide the utility bill by the kWh on it. That one rate already carries the demand charges, fees and taxes.

  3. $1,790.77

    Send the energy invoice

    Bronze creates an invoice for each tenant with bill-to, account, meter, dates and a line for adjustments or fees.

Work out your blended rate or read the full submeter billing guide.

Questions from industrial and flex parks

Can MeterSight bill demand separately from energy?
Bronze bills on a blended rate that includes demand charges. Silver shows each meter's 15-minute demand. Talk to us if your leases need demand billed as a separate line.
Do our meters need to be Ethernet?
No. Ethernet Modbus TCP meters connect directly, and RS-485 Modbus RTU meters connect through a standard gateway.

If you have a power meter, you need MeterSight

Open a live demo, or send us your meter list for a recommendation. We support sites anywhere in the US.